Model and Algorithm for Substantiating Solutions for Organization of High-Rise Construction Project

In the paper the models and the algorithm for the optimal plan formation for the organization of the material and logistical processes of the high-rise construction project and their financial support are developed. The model is based on the representation of the optimization procedure in the form of a non-linear problem of discrete programming, which consists in minimizing the execution time of a set of interrelated works by a limited number of partially interchangeable performers while limiting the total cost of performing the work. The proposed model and algorithm are the basis for creating specific organization management methodologies for the high-rise construction project. © The Authors, published by EDP Sciences, 2018.

Авторы
Anisimov V.1 , Anisimov E. 2 , Chernysh A.1
Сборник материалов конференции
Издательство
EDP Sciences
Язык
Английский
Статус
Опубликовано
Номер
03003
Том
33
Год
2018
Организации
  • 1 Peter the Great St. Petersburg Polytechnic University, Institute of Industrial Economics, Management and Trade, St. Petersburg, 195251, Russian Federation
  • 2 Peoples' Friendship University of Russia, Moscow, 117198, Russian Federation
Ключевые слова
Optimization; Discrete programming; Execution time; Financial support; High-rise construction; Model and algorithms; Nonlinear problems; Optimization procedures; Organization management; Project management
Дата создания
19.10.2018
Дата изменения
19.10.2018
Постоянная ссылка
https://repository.rudn.ru/ru/records/article/record/6777/
Поделиться

Другие записи