The problems of optimal resources allocation refer to complex combinatorial problems of projects control. The problem of optimal resources allocation is considered by a set of independent operations for a case when operations rate depends linearly on resources quantity and operations state. The necessary optimality conditions are obtained in the form of the Pontryagin maximum principle.