Advances in Intelligent Systems and Computing. Vol. 622. 2018. P.. 469-475
The authors present the actual scenario of transition from mining with caving to mining with backfilling in a deeplevel ore mine exposed to high horizontal stress of 5H. Backfill mixture is prepared on the backfill preparation plant of the mine using the local material. © 2018 Sidorenko A. A., Sirenko Yu. G., Sidorenko S. A.