System for Uncertainty Factors Accounting When Optimizing and Choosing Effective Options for Network Work Schedules on a Dynamic Model with Dead-End Controls

This article proposes accounting for uncertainty factors in a dynamic optimization model. Accounting for uncertainty factors in equipment performance is represented by a decreasing piecewise-constant function, the domain of which is the expert ordinal measurement scale. The basis of the optimization of the execution time on the example of creating a helicopter technology is the dead-end control method which refers to such an admissible Boolean control in which the replacement of an arbitrary zero component by one leads to a violation of the resource constraint. To ensure stable work of a manufacturer, several options of network schedules are usually calculated based on various initial data. The final choice of the effective option is made according to a vector criterion, which can include the time of completion of a complex of works, the degree of intensity of a plant's work plans, the uniformity of the equipment load (work teams), etc. © Published under licence by IOP Publishing Ltd.

Authors
Korneenko V.P.1 , Nazyuta S.V. 2 , Chursin A.A. 2
Publisher
Institute of Physics Publishing
Number of issue
6
Language
English
Status
Published
Number
062129
Volume
666
Year
2021
Organizations
  • 1 V.A. Trapeznikov Institute of Control Sciences of Russian Academy of Sciences., 65 Profsoyuznaya str., Moscow, Russian Federation
  • 2 Rudn University., 6 Miklukho-Maklaya str., Moscow, Russian Federation
Keywords
Earth sciences; Control methods; Dynamic optimization models; Equipment performance; Measurement scale; Network schedules; Piece-wise-constant functions; Resource Constraint; Uncertainty factors; Uncertainty analysis
Date of creation
20.04.2021
Date of change
20.04.2021
Short link
https://repository.rudn.ru/en/records/article/record/72042/
Share

Other records