Optimization of Flow Diagrams of Multiphase Pump-Ejector Systems for Improving Their Operational Efficiency with Combined Oil and Gas Gathering

It is shown that the primary cause of inefficient operation of multiphase pump-ejector systems installed in oil fields for combined oil and gas gathering is that not only associated (casing-head) gas, but also oil recovered incidentally with water enters the receiving chambers of jet apparatuses. Even under the current operation conditions, the power consumption at DNS-0122 Sofinskaya booster-type pumping plant can be reduced more than twofold by utilizing the existing infrastructure to the maximum and optimizing the flow diagrams of the pump-ejector system where the functions of submersible centrifugal pumps and jet apparatuses are separated. In future development, the pump-ejector system could be provided with an additional ejector, which will allow effective integration of straight-flow and circulatory schemes.

Authors
Number of issue
7-8
Language
English
Pages
499-503
Status
Published
Volume
50
Year
2014
Organizations
  • 1 Peoples’ Friendship University of Russia
  • 2 Gubkin Russian State University of Oil and Gas
Keywords
utilization of associated gas; pump; jet apparatus; pump-ejector system
Share

Other records